{"id":117145,"date":"2026-07-22T16:24:07","date_gmt":"2026-07-22T20:24:07","guid":{"rendered":"https:\/\/sutton.ca\/?p=117145"},"modified":"2026-07-22T16:49:30","modified_gmt":"2026-07-22T20:49:30","slug":"notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026","status":"publish","type":"post","link":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/","title":{"rendered":"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\"><strong>Information<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Start of construction: <\/strong> Monday, August 3, 2026<br><strong>Expected completion date: <\/strong> Friday, September 18, 2026<br><strong>Duration of construction: <\/strong> approximately 6 weeks, weather permitting<br><strong>Nature of the work: replacement <\/strong>of a culvert<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work may be postponed or modified depending on weather conditions or site constraints. Updates will be posted on the Town of Sutton\u2019s website and Facebook page. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Impact on Traffic<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Chemin R\u00e9al will be <strong>completely closed starting at house number 998 (past the PENS reception desk), along the last 100 meters<\/strong> of the road.<\/li>\n\n\n\n<li>Due to construction and the presence of heavy vehicles, access to R\u00e9al Road will be restricted and <strong>limited to local traffic from Harold Road<\/strong>.<\/li>\n\n\n\n<li>The parking lots at the top of Chemin R\u00e9al (near the visitor center + P5 + 1000 Chemin R\u00e9al) will be<strong> closed<\/strong>.<\/li>\n\n\n\n<li>Residents of Val Sutton will have access to their homes.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">We ask that you allow a little extra time for your trips and follow the posted signs to ensure everyone\u2019s safety.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Access to the Parc d&#8217;environnement naturel de Sutton (PENS)<\/strong><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Visitors to the Parc d&#8217;environnement naturel de Sutton (PENS) will continue to have access to the reception\/ticket booth, located at <strong>800 Chemin R\u00e9al (elevation 520)<\/strong>. However, parking will be restricted for the duration of the construction work, specifically <strong>:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Parking at <strong>552 Chemin R\u00e9al: OPEN<\/strong><\/li>\n\n\n\n<li>Parking on the left side of Chemin R\u00e9al, <strong>before the ticket booth: CLOSED<\/strong><\/li>\n\n\n\n<li>Parking lot past the PENS reception desk at <strong>1000 R\u00e9al Road: CLOSED<\/strong><\/li>\n\n\n\n<li><strong>Mont Sutton<\/strong> Parking <strong>Lot P5: CLOSED<\/strong><\/li>\n\n\n\n<li>No parking will be permitted along Chemin R\u00e9al <strong>between civic number 552 and the construction zone: PROHIBITED<\/strong><\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Pedestrian walkway<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">To facilitate access to the hiking trail, a temporary pedestrian corridor will be set up along Chemin R\u00e9al, <strong>between the parking lot at 552 Chemin R\u00e9al and the PENS ticket booth<\/strong>. Visitors must follow the posted signs and remain vigilant near the construction zone. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><span class=\"wp-rich-text-font-awesome-icon wp-font-awesome-icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-prefix=\"fas\" data-icon=\"circle-info\" class=\"svg-inline--fa fa-circle-info \" role=\"img\" viewBox=\"0 0 512 512\"><path fill=\"currentColor\" d=\"M256 512A256 256 0 1 0 256 0a256 256 0 1 0 0 512zM216 336l24 0 0-64-24 0c-13.3 0-24-10.7-24-24s10.7-24 24-24l48 0c13.3 0 24 10.7 24 24l0 88 8 0c13.3 0 24 10.7 24 24s-10.7 24-24 24l-80 0c-13.3 0-24-10.7-24-24s10.7-24 24-24zm40-208a32 32 0 1 1 0 64 32 32 0 1 1 0-64z\"><\/path><\/svg><\/span> For any additional information, please contact the Public Works Department by phone at 450-538-2290, option 2, or by email at <a href=\"mailto:contact.tp@sutton.ca\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>contact.tp@sutton.ca<\/strong>.<\/a><\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Subscribe to CITAM!<\/strong><br>To stay informed about upcoming work and any urgent alerts, we ask you to register for the mass notification and alert application <strong>CITAM<\/strong> on the Town&#8217;s website at <a href=\"https:\/\/sutton.ca\/en\/citam\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>sutton.ca\/citam<\/strong><\/a>. This is the most effective and fastest way to receive all relevant and urgent information in real time: you will receive messages on <strong>your phone<\/strong> (home or cell), as well as <strong>by text message<\/strong> or <strong>email<\/strong>, according to your preference. <\/p>\n<\/blockquote>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/sutton.ca\/wp-content\/uploads\/2021\/10\/image.png\"><img decoding=\"async\" width=\"242\" height=\"81\" src=\"https:\/\/sutton.ca\/wp-content\/uploads\/2021\/10\/image.png\" alt=\"\" class=\"wp-image-44788\"\/><\/a><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The Town of Sutton would like to inform residents and visitors that major construction work will take place from August 3 to September 18, 2026, to replace a large culvert located on Chemin R\u00e9al, between street addresses 998 and 1000, near the P\u00e9kan waterfall. Traffic and parking will be limited in this area. <\/p>\n","protected":false},"author":17,"featured_media":117147,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_searchwp_excluded":"","footnotes":""},"categories":[170],"tags":[],"hf_cat_post":[1829],"class_list":["post-117145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-public-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18 - Town of Sutton<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18 - Town of Sutton\" \/>\n<meta property=\"og:description\" content=\"The Town of Sutton would like to inform residents and visitors that major construction work will take place from August 3 to September 18, 2026, to replace a large culvert located on Chemin R\u00e9al, between street addresses 998 and 1000, near the P\u00e9kan waterfall. Traffic and parking will be limited in this area.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"Town of Sutton\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/VilleDeSutton\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T20:24:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-22T20:49:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sutton.ca\/wp-content\/uploads\/2026\/07\/Carte-travaux-Real.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Isabelle Capmas\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Isabelle Capmas\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/\"},\"author\":{\"name\":\"Isabelle Capmas\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#\\\/schema\\\/person\\\/fcddbf766da4e6e679c1907f20cb0fdb\"},\"headline\":\"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18\",\"datePublished\":\"2026-07-22T20:24:07+00:00\",\"dateModified\":\"2026-07-22T20:49:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/\"},\"wordCount\":424,\"publisher\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/sutton.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Carte-travaux-Real.png\",\"articleSection\":[\"Public works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/\",\"url\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/\",\"name\":\"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18 - Town of Sutton\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/sutton.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Carte-travaux-Real.png\",\"datePublished\":\"2026-07-22T20:24:07+00:00\",\"dateModified\":\"2026-07-22T20:49:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/sutton.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Carte-travaux-Real.png\",\"contentUrl\":\"https:\\\/\\\/sutton.ca\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Carte-travaux-Real.png\",\"width\":1200,\"height\":630},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\",\"item\":\"https:\\\/\\\/sutton.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/sutton.ca\\\/en\\\/\",\"name\":\"Town of Sutton\",\"description\":\"Official website of the Town of Sutton\",\"publisher\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#organization\"},\"alternateName\":\"Sutton\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/sutton.ca\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#organization\",\"name\":\"Ville de Sutton\",\"alternateName\":\"Sutton\",\"url\":\"https:\\\/\\\/sutton.ca\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/sutton.ca\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/logo-entite-ville-de-Sutton.png\",\"contentUrl\":\"https:\\\/\\\/sutton.ca\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/logo-entite-ville-de-Sutton.png\",\"width\":696,\"height\":696,\"caption\":\"Ville de Sutton\"},\"image\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/VilleDeSutton\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ville-de-sutton\\\/\",\"https:\\\/\\\/www.instagram.com\\\/ville_sutton\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCho_cik7f5pK2CjJ0f5dxSA\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/en\\\/#\\\/schema\\\/person\\\/fcddbf766da4e6e679c1907f20cb0fdb\",\"name\":\"Isabelle Capmas\",\"url\":\"https:\\\/\\\/sutton.ca\\\/en\\\/author\\\/isasutton\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18 - Town of Sutton","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/","og_locale":"en_US","og_type":"article","og_title":"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18 - Town of Sutton","og_description":"The Town of Sutton would like to inform residents and visitors that major construction work will take place from August 3 to September 18, 2026, to replace a large culvert located on Chemin R\u00e9al, between street addresses 998 and 1000, near the P\u00e9kan waterfall. Traffic and parking will be limited in this area.","og_url":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/","og_site_name":"Town of Sutton","article_publisher":"https:\/\/www.facebook.com\/VilleDeSutton","article_published_time":"2026-07-22T20:24:07+00:00","article_modified_time":"2026-07-22T20:49:30+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/sutton.ca\/wp-content\/uploads\/2026\/07\/Carte-travaux-Real.png","type":"image\/png"}],"author":"Isabelle Capmas","twitter_misc":{"Written by":"Isabelle Capmas","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#article","isPartOf":{"@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/"},"author":{"name":"Isabelle Capmas","@id":"https:\/\/sutton.ca\/en\/#\/schema\/person\/fcddbf766da4e6e679c1907f20cb0fdb"},"headline":"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18","datePublished":"2026-07-22T20:24:07+00:00","dateModified":"2026-07-22T20:49:30+00:00","mainEntityOfPage":{"@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/"},"wordCount":424,"publisher":{"@id":"https:\/\/sutton.ca\/en\/#organization"},"image":{"@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/sutton.ca\/wp-content\/uploads\/2026\/07\/Carte-travaux-Real.png","articleSection":["Public works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/","url":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/","name":"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18 - Town of Sutton","isPartOf":{"@id":"https:\/\/sutton.ca\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#primaryimage"},"image":{"@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/sutton.ca\/wp-content\/uploads\/2026\/07\/Carte-travaux-Real.png","datePublished":"2026-07-22T20:24:07+00:00","dateModified":"2026-07-22T20:49:30+00:00","breadcrumb":{"@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#primaryimage","url":"https:\/\/sutton.ca\/wp-content\/uploads\/2026\/07\/Carte-travaux-Real.png","contentUrl":"https:\/\/sutton.ca\/wp-content\/uploads\/2026\/07\/Carte-travaux-Real.png","width":1200,"height":630},{"@type":"BreadcrumbList","@id":"https:\/\/sutton.ca\/en\/notice-of-work-to-replace-a-culvert-at-the-top-of-chemin-real-august-3-through-september-18-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"","item":"https:\/\/sutton.ca\/en\/"},{"@type":"ListItem","position":2,"name":"Notice of Work to Replace a Culvert at the Top of Chemin R\u00e9al, August 3 through September 18"}]},{"@type":"WebSite","@id":"https:\/\/sutton.ca\/en\/#website","url":"https:\/\/sutton.ca\/en\/","name":"Town of Sutton","description":"Official website of the Town of Sutton","publisher":{"@id":"https:\/\/sutton.ca\/en\/#organization"},"alternateName":"Sutton","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sutton.ca\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/sutton.ca\/en\/#organization","name":"Ville de Sutton","alternateName":"Sutton","url":"https:\/\/sutton.ca\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sutton.ca\/en\/#\/schema\/logo\/image\/","url":"https:\/\/sutton.ca\/wp-content\/uploads\/2025\/07\/logo-entite-ville-de-Sutton.png","contentUrl":"https:\/\/sutton.ca\/wp-content\/uploads\/2025\/07\/logo-entite-ville-de-Sutton.png","width":696,"height":696,"caption":"Ville de Sutton"},"image":{"@id":"https:\/\/sutton.ca\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/VilleDeSutton","https:\/\/www.linkedin.com\/company\/ville-de-sutton\/","https:\/\/www.instagram.com\/ville_sutton\/","https:\/\/www.youtube.com\/channel\/UCho_cik7f5pK2CjJ0f5dxSA"]},{"@type":"Person","@id":"https:\/\/sutton.ca\/en\/#\/schema\/person\/fcddbf766da4e6e679c1907f20cb0fdb","name":"Isabelle Capmas","url":"https:\/\/sutton.ca\/en\/author\/isasutton\/"}]}},"_links":{"self":[{"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/posts\/117145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/comments?post=117145"}],"version-history":[{"count":1,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/posts\/117145\/revisions"}],"predecessor-version":[{"id":117348,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/posts\/117145\/revisions\/117348"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/media\/117147"}],"wp:attachment":[{"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/media?parent=117145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/categories?post=117145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/tags?post=117145"},{"taxonomy":"hf_cat_post","embeddable":true,"href":"https:\/\/sutton.ca\/en\/wp-json\/wp\/v2\/hf_cat_post?post=117145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}