{"id":82881,"date":"2024-10-18T09:19:53","date_gmt":"2024-10-18T13:19:53","guid":{"rendered":"https:\/\/sutton.ca\/staging\/?p=82881"},"modified":"2025-07-13T12:08:11","modified_gmt":"2025-07-13T16:08:11","slug":"western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024","status":"publish","type":"post","link":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/","title":{"rendered":"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>The Public Works and Fixed Assets Department is pleased to inform you of the final work scheduled to take place over the next two weeks, between October 21 and November 1. Barring unforeseen circumstances, the 2024 Western Street reconstruction project will be completed by November 1!<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1-1024x538.png\" alt=\"\" class=\"wp-image-82523\" srcset=\"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1-1024x538.png 1024w, https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1-300x158.png 300w, https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1-768x403.png 768w, https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><i class=\"fas fa-arrow-alt-circle-right\"><\/i> In the <strong>southern<\/strong> parking lot of Goyette Hill Park: <strong>open; PLEASE NOTE that the parking lot will be closed on the day the second coat of asphalt is laid down (date to be confirmed).<\/strong><\/p>\n\n\n\n<p><i class=\"fas fa-arrow-alt-circle-right\"><\/i> In the <strong>northern <\/strong>parking lot of Goyette Hill Park: <strong>open.<\/strong><\/p>\n\n\n\n<p><strong>The use of alternative parking remains recommended.<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><i class=\"fas fa-hand-point-right\"><\/i> <strong><strong>TEMPORARY AND PERMANENT PARKING MAP<\/strong><\/strong>&nbsp;<a href=\"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/05\/SUTTON-Carte-Stationnements-Temporaires-8.5-x-11.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>download here<\/strong><\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>WORK COMPLETED<\/strong><\/h3>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<ul class=\"wp-block-list\">\n<li>Sidewalk and concrete curbs construction.<\/li>\n\n\n\n<li>Concrete pouring to connect driveways to sidewalks and curbs.<\/li>\n\n\n\n<li>Gravelling and final grading of Western Street.<\/li>\n\n\n\n<li>Construction of crossing strips for pedestrian protection.<\/li>\n\n\n\n<li>Paving of street (one coat) and Western Street\/Route 215 intersection (two coats). <mark style=\"background-color:#f0571d\" class=\"has-inline-color has-fl-topbar-bg-color\"><strong> PLEASE NOTE: second coat of street asphalt scheduled for Spring 2025<\/strong><\/mark>.<\/li>\n\n\n\n<li>Paving of south parking lot: one coat (second coat to come).<\/li>\n\n\n\n<li>Planting in the islands and around the south and north parking lots.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n<\/blockquote>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>WORK TO BE COMPLETED BY NOVEMBER 1<\/strong><\/h3>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<ul class=\"wp-block-list\">\n<li><strong>Paving of south parking lot: second coat<\/strong>.<\/li>\n\n\n\n<li><strong>Planting in the retention basins of the south and north parking lots.<\/strong><\/li>\n\n\n\n<li><strong>Planting in the street islands<\/strong>.<\/li>\n\n\n\n<li><strong>Repairs to driveways and residents&#8217; yards<\/strong>.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n<\/blockquote>\n\n\n\n<p><i class=\"fas fa-exclamation-triangle\"><\/i> Work may be modified or cancelled due to operational constraints or weather conditions.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><i class=\"fas fa-info\"><\/i> <mark style=\"background-color:#f0571d\" class=\"has-inline-color has-fl-topbar-bg-color\"><strong>FOR ANY QUESTION ON THE WORKSITE<\/strong><\/mark> <i class=\"fas fa-info\"><\/i><br>Contact the Public Works and Fixed Assets Department:<br>by telephone at 450 915-6684<br>by e-mail at&nbsp;<a href=\"mailto:secr.tp@sutton.ca\" target=\"_blank\" rel=\"noreferrer noopener\">secr.tp@sutton.ca<\/a><br>Ongoing Information on&nbsp;<a href=\"https:\/\/sutton.ca\/staging\/en\/category\/news\/western-st\/\" target=\"_blank\" rel=\"noreferrer noopener\">sutton.ca\/western2024<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Public Works and Fixed Assets Department is pleased to inform you of the final work scheduled to take place over the next two weeks, between October 21 and November 1. Barring unforeseen circumstances, the 2024 Western Street reconstruction project will be completed by November 1! In the southern parking lot of Goyette Hill Park:&hellip;<\/p>\n","protected":false},"author":17,"featured_media":82523,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_searchwp_excluded":"","footnotes":""},"categories":[170],"tags":[],"class_list":["post-82881","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-public-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024 - test optimisation<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024 - test optimisation\" \/>\n<meta property=\"og:description\" content=\"The Public Works and Fixed Assets Department is pleased to inform you of the final work scheduled to take place over the next two weeks, between October 21 and November 1. Barring unforeseen circumstances, the 2024 Western Street reconstruction project will be completed by November 1! In the southern parking lot of Goyette Hill Park:&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"test optimisation\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/VilleDeSutton\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-18T13:19:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-13T16:08:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Isabelle Capmas\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Isabelle Capmas\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/\"},\"author\":{\"name\":\"Isabelle Capmas\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#\\\/schema\\\/person\\\/fcddbf766da4e6e679c1907f20cb0fdb\"},\"headline\":\"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024\",\"datePublished\":\"2024-10-18T13:19:53+00:00\",\"dateModified\":\"2025-07-13T16:08:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/\"},\"wordCount\":302,\"publisher\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png\",\"articleSection\":[\"Public works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/\",\"url\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/\",\"name\":\"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024 - test optimisation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png\",\"datePublished\":\"2024-10-18T13:19:53+00:00\",\"dateModified\":\"2025-07-13T16:08:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#primaryimage\",\"url\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png\",\"contentUrl\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png\",\"width\":1200,\"height\":630},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\",\"item\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/\",\"name\":\"test optimisation\",\"description\":\"Official website of the Town of Sutton\",\"publisher\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#organization\"},\"alternateName\":\"Sutton\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#organization\",\"name\":\"Ville de Sutton\",\"alternateName\":\"Sutton\",\"url\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/logo-entite-ville-de-Sutton.png\",\"contentUrl\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/logo-entite-ville-de-Sutton.png\",\"width\":696,\"height\":696,\"caption\":\"Ville de Sutton\"},\"image\":{\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/VilleDeSutton\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ville-de-sutton\\\/\",\"https:\\\/\\\/www.instagram.com\\\/ville_sutton\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCho_cik7f5pK2CjJ0f5dxSA\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/#\\\/schema\\\/person\\\/fcddbf766da4e6e679c1907f20cb0fdb\",\"name\":\"Isabelle Capmas\",\"url\":\"https:\\\/\\\/sutton.ca\\\/staging\\\/en\\\/author\\\/isasutton\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024 - test optimisation","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024 - test optimisation","og_description":"The Public Works and Fixed Assets Department is pleased to inform you of the final work scheduled to take place over the next two weeks, between October 21 and November 1. Barring unforeseen circumstances, the 2024 Western Street reconstruction project will be completed by November 1! In the southern parking lot of Goyette Hill Park:&hellip;","og_url":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/","og_site_name":"test optimisation","article_publisher":"https:\/\/www.facebook.com\/VilleDeSutton","article_published_time":"2024-10-18T13:19:53+00:00","article_modified_time":"2025-07-13T16:08:11+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png","type":"image\/png"}],"author":"Isabelle Capmas","twitter_misc":{"Written by":"Isabelle Capmas","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#article","isPartOf":{"@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/"},"author":{"name":"Isabelle Capmas","@id":"https:\/\/sutton.ca\/staging\/en\/#\/schema\/person\/fcddbf766da4e6e679c1907f20cb0fdb"},"headline":"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024","datePublished":"2024-10-18T13:19:53+00:00","dateModified":"2025-07-13T16:08:11+00:00","mainEntityOfPage":{"@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/"},"wordCount":302,"publisher":{"@id":"https:\/\/sutton.ca\/staging\/en\/#organization"},"image":{"@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#primaryimage"},"thumbnailUrl":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png","articleSection":["Public works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/","url":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/","name":"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024 - test optimisation","isPartOf":{"@id":"https:\/\/sutton.ca\/staging\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#primaryimage"},"image":{"@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#primaryimage"},"thumbnailUrl":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png","datePublished":"2024-10-18T13:19:53+00:00","dateModified":"2025-07-13T16:08:11+00:00","breadcrumb":{"@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#primaryimage","url":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png","contentUrl":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2024\/10\/Infos-travaux-rue-pavee-EN-1200-x-630-px-1.png","width":1200,"height":630},{"@type":"BreadcrumbList","@id":"https:\/\/sutton.ca\/staging\/en\/western-street-reconstruction-site-work-info-for-the-two-weeks-of-october-21-and-28-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"","item":"https:\/\/sutton.ca\/staging\/en\/"},{"@type":"ListItem","position":2,"name":"Western Street reconstruction site \u2013 Work Info for the next two weeks of October 21 and 28, 2024"}]},{"@type":"WebSite","@id":"https:\/\/sutton.ca\/staging\/en\/#website","url":"https:\/\/sutton.ca\/staging\/en\/","name":"test optimisation","description":"Official website of the Town of Sutton","publisher":{"@id":"https:\/\/sutton.ca\/staging\/en\/#organization"},"alternateName":"Sutton","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sutton.ca\/staging\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/sutton.ca\/staging\/en\/#organization","name":"Ville de Sutton","alternateName":"Sutton","url":"https:\/\/sutton.ca\/staging\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sutton.ca\/staging\/en\/#\/schema\/logo\/image\/","url":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2025\/07\/logo-entite-ville-de-Sutton.png","contentUrl":"https:\/\/sutton.ca\/staging\/wp-content\/uploads\/2025\/07\/logo-entite-ville-de-Sutton.png","width":696,"height":696,"caption":"Ville de Sutton"},"image":{"@id":"https:\/\/sutton.ca\/staging\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/VilleDeSutton","https:\/\/www.linkedin.com\/company\/ville-de-sutton\/","https:\/\/www.instagram.com\/ville_sutton\/","https:\/\/www.youtube.com\/channel\/UCho_cik7f5pK2CjJ0f5dxSA"]},{"@type":"Person","@id":"https:\/\/sutton.ca\/staging\/en\/#\/schema\/person\/fcddbf766da4e6e679c1907f20cb0fdb","name":"Isabelle Capmas","url":"https:\/\/sutton.ca\/staging\/en\/author\/isasutton\/"}]}},"_links":{"self":[{"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/posts\/82881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/comments?post=82881"}],"version-history":[{"count":0,"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/posts\/82881\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/media\/82523"}],"wp:attachment":[{"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/media?parent=82881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/categories?post=82881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sutton.ca\/staging\/en\/wp-json\/wp\/v2\/tags?post=82881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}