Fee structure

Building permit
Construction, alteration, expansion or addition to a building (in the case of commercial or recreational use): $2 per $1,000 of work
Minimum: $50
Maximum: $2,000
Other use: $2 per $1,000 of work
Minimum: $50
Maximum: $1,000
Subdivision permit
$50 for the first lot created and $10 for each additional lot
Certificate of authorization
Commercial occupation

Principal use or bed and breakfast:
Home-based professional or commercial services:
Short-term rental for complementary use:

 

$50
$25
$100 (24-month period)

Signage

Sign:
Sign in the form of a sandwich board:

 

$50
$25

Tree cutting

Tree cutting for non-commercial purposes:

 

Tree cutting for commercial purposes

Cutting area less than 5 ha:
Cutting area at least 5 ha but less than 10 ha:
Cutting area at least 10 ha but less than 20 ha:
Cutting area at least 20 ha but less than 25 ha:
Cutting area at least 25 ha:

 

$20 for the first tree,
$10 for each additional tree

 

$100
$200
$275
$325
$350

Demolition of a building

Demolition of a principal building:
Demolition of a secondary building:
Demolition of a building that is subject to a demolition by-law:
Demolition of an agricultural building:

 

$100
$25
$650
$100

Other

Septic system installation:
Groundwater catchment (well):
Backfilling or excavation:
Creating an access lane (driveway):
Culvert:
Moving a building with an area greater than 4 m2 or height greater than 4m:
Pool or hot tub:
Artificial body of water:

 

$50
$25
$50
$50
$50
 
$25
$50
$100

Discretionary regulations and modification of the urban-planning and land-use by-law
Minor exemption:
Conditional use:
$300
$300
Specific constructions, alteration or occupancy proposals for an immovable (PPCMOI) and modification of the urban-planning and land-use by-law

Study fees:

 

$500

Other types of requests

LIDAR plan production of slopes:
Request for authorization from the CPTAQ:
Declaration of the exercise of a right with the CPTAQ:

$125
$100
$50